plan.jpg (1259 bytes) Water is one of the most crucial elements in development planning.
 

 

 

 

 

 

 

top.jpg (1736 bytes)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

top.jpg (1736 bytes)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

top.jpg (1736 bytes)

 

 

 

 

 

 

 

 

 

 


top.jpg (1736 bytes)

Govt. Of India has already formulated a national water policy to develop and conserve scarce and precious national resources in an integrated and environmentally sound basis.
Govt. of India had constituted  working group on minor irrigation programme for the Ninth Five Year plan. It suggested policies and strategies for the Ninth Plan for Minor Irrigation Sector. Major thrust areas identified are : p-1_2.jpg (15538 bytes)

buttonsq.gif (311 bytes)Speedy completion of large number of on-going projects
buttonsq.gif (311 bytes)Encouraging, propagating sprinkler and drip irrigation system in water scarce and draught prone areas
buttonsq.gif (311 bytes)Laying more emphasis for exploitation of ground water as compared to surface water minor irrigation schemes.

National Policy for Ground Water Development had suggested the following :

Ground Water Schemes

bd14579_.gif (267 bytes)There should be a periodical reassessment  on a scientific basis of the ground water potential, taking into consideration the quantity of the water available and economic viability.

bd14579_.gif (267 bytes)Exploitation of ground water resources should be so regulated as not to exceed the recharging possibilities, as also to ensure social equity.

bd14579_.gif (267 bytes)Integrated and co -ordinated development of surface water and ground water and their conjunctive use should be envisaged right from the project planning stage and form an essential part of the project.

Surface Water  Schemes

bd14579_.gif (267 bytes)Irrigation planning either in an individual project or in a basin as a whole should take into account the irrigability of land, cost effective irrigation options possible from all available sources of water.

bd14579_.gif (267 bytes)There should be a close integration of water use and land use policies. It has also suggested that water allocation in an irrigation system should be done with due regard to equity and social justice.

bd14579_.gif (267 bytes)Water rates should be adequate to cover the annual maintenance and operation charges and a part of the fixed cost.

bd14579_.gif (267 bytes)Efforts should be made to involve farmers progressively in various aspects of management of irrigation system. Participatory irrigation management should be encouraged.

Ninth  Five Year Plan

Annual Plan 1999-2000

The following budgetary provision was made for Minor irrigation department for the year 1999-2000 :

A. Minor irrigation Establishment Rs. 2134.125 Lakhs
B. State Plan Rs.   265.875 Lakhs
C. RIDF (NABARD) Rs. 4000.000 Lakhs
. Total Rs. 6400.000 Lakhs

Details of above budgetary provision into General Area / Jharkhand Area and Sub Plan are given below :

Amount in Rs.Lakh

A. Minor Irrigation

Name of Scheme Approved plan Outlay and Budgetary Provision Amount Approved by Empowered Committee Allotment Expenditure
General Zone /Jharkhand Area Sub-Plan Total
MI Establishment 463.865 74.780 538.645 538.645 538.645 528.615
Tubewell Establishment 1595.480 - 1595.480 1595.480 1595.480 1592.870
Private Tubewell Scheme 50.000 - 50.000 - - -
Ground Water Survey 8.875 2.000 10.875 10.875 10.875 7.815
Surface Water Survey 3.750 1.250 5.000 5.000 5.000 4.350
Surface Water Scheme Under State Plan 90.000 110.000 200.000 200.000 200.000 160.470
Total of A 2211.970 188.030 2400.000 2350.00 2350.000

2294.120

B. NABARD Assisted Projects (RIDF)

State Tubewell Under NABARD Phase - 1 500.000 - 500.000 500.000 498.300 179.080
Tubewell Under NABARD Phase - 3 3000.000 - 3000.000 3000.000 2999.310 1964.870
Surface Water Scheme Under NABARD 375.000 125.000 500.000 490.070 465.920 321.830
Total of B 3875.000 125.000 4000.000 3990.070 3963.530 2465.690
Grand Total (A+B 6086.970 313.030 6400.000 6340.070 6313.530

4759.810

Physical Achievements During Plan 1999-2000

Private Tubewell Scheme

Department ,under the scheme gives subsidies to the individuals for construction of Private Tubewells, Bamboo Boring, and Irrigation wells. Due to its utility, the scheme is very popular among the farmers of the State. Under the Scheme   maximum subsidy allowed for sinking of Shallow Boring and construction of Irrigation Well is Rs.13,750 and Rs.19,600 respectively. This Scheme is generally executed through Blocks , however in some Districts, MI Divisions are also executing this Scheme through District Development Authority.

General Zone

Scheme Achievement in Hectare Irrigation Potential Created in Hectare
Private Tubewell 2383 7149
Bamboo Boring 774 1548
Irrigation Well - -
Total 3157 8697

Jharkhand Zone

In the District falling under the Jharkhand Zone 50 Irrigation Wells have been constructed.

State Tubewells Under NABARD

A total of 758 incomplete tubewell schemes were taken up and upto March 2000 Rs.498.30 lakhs were allotted to different MI Divisions against which Rs. 179.08 lakhs has been spent.

New RIDF Tubewell Scheme

NABARD sanctioned this Project at a cost of Rs.5906.32 lakhs under which 371 new State Tubewells are to be constructed in 162 blocks of 28 Districts. The Project is to be completed by 2000-2001. On completion of the project 29680 hectares of land could be provided with irrigation facilities. A provision of Rs.3000 lakhs was made for this programme in the year 1999-2000 against which Rs.1964.870 were spent. 249 Tubewells have been drilled and civil works on those wells are in progress. The total expenditure on this project upto March 2000 is Rs.2910.72 lakhs.

Surface Water Schemes under State Plan

Total Number of Scheme Taken Up 55
Original Estimated Cost Rs.1043.72 Lakhs
Revised Estimated Cost Rs. 1437.72 lakhs
Expenditure Upto March 1998 Rs. 705.46 lakhs
Expenditure During 1998-99 Rs. 136.79 lakhs
Expenditure During 1999-2000 Rs. 147.935 lakhs
Irrigation Potential to be Created 5238 Hectares

Ground Water Survey and Investigation

A sum of Rs. 10.875 were allotted to different GW Divisions against which Rs. 7.815 have been spent during 1999-2000. Three exploratory Tubewells have been dug. In addition to this at ten different places, under Danapur, Koilwar, Naubatpur, Bihta, and Phulwarisharif Blocks, Aquifer Performance Tests and Recuperation Tests were conducted.

Surface Water Survey and Investigation

For survey and investigation of new surface water schemes, a sum of Rs. 5 lakhs were allotted against which Rs. 4.35 lakhs were spent on survey of 19 schemes which would be completed under NABARD and State Plan.

New MI Division Schemes for Central and North Bihar Under State Plan

Scheme Estimated Cost
(Rs.lakh)

1997-98
(Rs.Lakh)

Expenditure
1998-99
(Rs.Lakh)

1999-2000
(Rs.Lakh)

Irrigation Potential Created (Acres)
Allotment Expenditure Allotment Expenditure
Laukaha MI Scheme 72.025 61.860 46.680 6.330 8.660 0 2500
Ramsang MI Scheme 24.985 9.965 6.722 2.000 1.400 1.400 1000
Palar MI Scheme 135.000 96.034 91.000 7.980 2.000 0 3000
Murgawa Weir Scheme 22.200 22.200 3.712 16.700 10.450 3.760 625
Ankushi Weir Scheme 21.000 21.000 5.700 14.000 7.250 4.320 1100

Annual Plan 2000-2001

A total outlay of Rs. 8674 lakh has been earmarked for the Minor irrigation department during the financial year 2000-2001. The details are the following:

(Rs. Lakh)

Scheme Original Outlay Revised Outlay

A. State Plan

1. Establishment

Minor irrigation 886.572 677.910
State Tubewell 2625.895 1996.080
Total 3512.467 2673.990

2. Works

Private Tubewell Schemes 500.00 500.00
State Tubewell Schemes 155.533 0.000
Surface Water Schemes 476.000 470.010
Ground Water Schemes 20.000 20.000
Surface Water Survey 10.000 10.000
Total 1161.533 1000.110
Total of 1+2 4674.000 3674.000

B. RIDF (NABARD Assisted)

1. State Tubewell

NABARD Phase -1 455.000 455.000
NABARD Phase -3 1673.850 1673.850
NABARD Phase -5 605.489 605.480
Total 2734.330 2734.330

2. Medium Irrigation Scheme

NABARD Phase -3 283.000 283.000
NABARD Phase -5 982.670 982.670
Total 1265.670 1265.670
3. Building Construction
. 0.000 0.000
Total of 1+2+3 4000.000 4000.000
Grand Total of A+B 8674.000 7674.000

Summary Plan 2000-2001

Rs. Lakh

  Original Outlay Revised Outlay
State Plan 4,674.000 3,674.000
RIDF 4,000.000 4,000.000
Total 8674.000 7674.000

OTHER DETAILS AND DATA ON VARIOUS PLAN SCHEMES